Crown Casino Carpark

Project Outline

The old site of the Burswood Dome has been transformed into a new car park to accommodate for the rapidly growing Crown Complex developments. With an average 30 Lux requirement throughout the car park, the original design utilised a total of 114x 150W Metal Halide fittings on 79 x 10m Hinged Poles with a back-to-back mounting arrangement.

Working closely with ARUP, Mondoluce was able to offer the CREE High Output as an alternative (LED) solution with the aim to save on capital (installation and maintenance) costs. The end result saw a total of 36x CREE High Output 240LED fittings utiising a combinationType 4 Medium and Type 5 Short optics on 36x 10m fixed poles with a single mounting arrangement. This was a total capital saving of 78x Light fittings and 43x Poles from Hinged to Fixed whilst achiveing a 45Lux average at the end of the luminaire life.

Key Partners

Client:
Crown Perth

Electrical + Lighting Consultant:
ARUP

Builder:
Probuild Constructions

Electrical Contractor:
Everett-Smith

Photographer: 
Ron Tan

Enquire about a project